Creator

Max Touhey

Preview

image preview

Creation Date

2016

Description

Cranes started hoisting the first and smallest of the development’s modular components; June 15th, 2016

The modular units were being fabricated in Keasbey, New Jersey, and were then stored in Newark as they awaited placement at the site, which spans from about 64th to 68th streets. The modular components, of which there are about a dozen, were being shipped in during slack tide and placed between 12:30 and 4:30 a.m. on and off through August 23, 2017, during which FDR Drive was closed.

Courtesy of Max Touhey for Turner Construction


Keywords

River Campus, Turner Construction

Share

Image Location

 
COinS